Introduction
Construction project are very complex because they involve human and non human factors and variables.They usally have long duration,various uncertainties,and complex relationship among the participant.To identify and analyze potential variationa in a project as early as possible can enhance both the the assessment and implementation of the project.
Variation order involved additional omission,alteration ans substitution in term of quality quantity and schedule of work.Without contractual clause,the building contractor would have to agree the erect without any change building shown on the drawing and represented in the bill for a contract sum.
We are in industrial civil construction since last 11 years with good experience, machinery, manpower and technical knowledge. We are doing quality work with speed and accuracy having latest machinery, equipments and technology. We are trust gainers and solution creators. We do not negotiate our quality. We would like to do civil construction of projects and all types of maintenance work like plumbing, flooring and tilling, chemical coatings and grouting, electrical fitting, painting, gardening, furniture, etc.
The other machineries and vehicles like pneumatic breaker, JCB, poclain, tractors, tippers can be quickly arranged on hiring basis.
Saanvi Constructions requires an integrated team process in which the design team and all affected members work together throughout the phase of the project and evaluate the design for cost, quality of life, future flexibility, efficiency, overall environmental impact, productivity, creativity.
The manpower readily available with us is 95 nos. including skilled and unskilled labours. Our experienced team includes one site engineer (DCE) and four site supervisors having graduation in B com and BA. The manpower can be increased depending on nature of work.